2.1.1 Pre-Design Studies, Detailed Design And Supervision Services

Запрос свидетельства заинтересованности

Общая информация

Тонга
   TO-MOH-449646-CS-QCBS
   14 ноя 2024
25 ноя 2024
  
Ministry of Health
   Английский
   Другой
   опубликовано: 14 ноя 2024

Контактная информация

   Semisi Fukofuka
Ministry of Health
Ministry of Health, Taufa'ahau Rd, Tofoa, Tonga
Тонга
   +676 779 8614
   Щелкните здесь

Задания

Консультирование по вопросам гражданского строительства

Additional resources

Краткое содержание

      

notice_summary_english: Detailed Design & Construction Supervision Services (DnS) for Tonga North Islands Group Healthcare Facilities
Reference No: TO-MOH-449646-CS-QCBS
The Ministry of Health (MoH) of the Kingdom of Tonga is expected to receive financing from the World Bank toward the cost of the Health Enhancement and Resiliency in Tonga Project (HEART) and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include the “Detailed Design & Supervision Services for Tonga North Islands Group Healthcare Facilities” to perform the following tasks in 3 Phases, but not limited to:
PHASE 1: Pre-Design Assessments & Studies for Northern Islands (Lump-Sum, 12 Months)
Master Planning 7+ hectares of the Prince Wellington Ngu Hospital (PWNH) site for the next 10 years of development;
Performing rapid and detailed assessments of 24 existing buildings at PWNH;
Preparing Environmental and Social due diligence documents for Project Component 2;
Assessing, planning, and preparing medical equipment/supply specifications and bid documents for PWNH and Northern Island CHCs and Nursing Clinics in Vava’u and Niua Island Group (6 facilities);
Assessing ICT and digital connectivity for PWNH and Northern Island CHCs and Nursing Clinic in Vava’u and Niua Island Group (6 facilities and including Vaiola Hospital in Nuku’alofa);
PHASE 2: Detailed Design of PWNH Hospital Facility (Lump-Sum, 15 months)
Providing detailed architectural and engineering studies, design, costings, plan, and prepare bid documents for a new 3600sqm hospital and new medical staff quarters at PWNH & the upgrade, retrofit, and/or strengthening of select existing buildings at PWNH;
Preparing Operations & Maintenance plans;
Providing Procurement Support;
PHASE 3: Construction Supervision and Monitoring of PWNH facility (Time-Based, not to exceed a maximum, 24 months)
Providing construction supervision and monitoring services for the development of PWNH.
The total level

Исходный текст


More information: Щелкните здесь
Данное извещение приведено исключительно для вашего сведения.
Мы прилагаем все усилия к тому, чтобы информация на нашем сайте была всегда точной и своевременной, но мы не можем гарантировать ее полную безошибочность.
Напишите нам, если у вас есть замечания или уточнения к тексту этого извещения.