Поиск

Pre-qualification / Initial Selection for Rehabilitation / Construction of Civil Works, alongwith Design Supply, Installation, Testing & Commissioning of Electrical & Mechanical Works of Dargai Hydroelectric Power Station and Clearance of Defect Liabilities (EXPIRED)

Запрос свидетельства заинтересованности

Общая информация

Пакистан
   District (Malakand), Tehsil (Dargai)
   C-E & M / HS – 61 / IFIS - 001
   25 янв 2022
15 фев 2022
  
PAKISTAN - Water and Power Development Authority
   (i) The Applicant shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the cash flow requirements estimated as US$ 2 Million for the subject contract(s) net of the Applicants other commitments.
Minimum average annual turnover of US$ 10M (Ten Million USD) for the last 5 years.
A minimum number of similar contracts specified below that have been satisfactorily and substantially completed as a prime contractor, joint venture member management contractor or subcontractor between 1st July 2011 and application submission deadline: 2 contracts, each of minimum value US$ 12 Million that have been successfully and substanitally completed and are similar to the proposed works. Out of 2 projects, one project should be substantially completed by the bidder outside their home country. The similarity shall be based on the physical size, complexity and technicity of the Works.
Construction and/or Rehabilitation of power channel and/or spillway chute and/or similar hydraulic structure with shotcrete and/or plain concrete and/or reinforced concrete lining and construction of cross drainage works that have been satisfactorily and substantially completed.”
Design, supply, installation, testing and commissioning of hydropower plant of 15 MW (generating unit size should not be less than 5MW having Francis type turbine) or higher rating with following equipment / components which are performing satisfactorily for consecutive two years:
- Hydraulic Turbine Generating Units;
- Turbine Governors, Main Inlet Valves, EOT cranes;
- Balance of Plant E&M Equipment;
- 132 KV or higher substations;
- Power Transformers;
- SCADA and Protection.
   Английский
   Международый конкурс
   опубликовано: 25 янв 2022

Контактная информация

   Muhammad Arfan
General Manager
Water and Power Development Authority
104 - WAPDA House Lahore
Lahore, Punjab 54000
Пакистан
   +924299202189
   +924236369004
   Щелкните здесь

Задания

Работы по строительству гидромеханических сооружений Строительство гидроэлектростанций Работы по строительству дамб, каналов, оросительных каналов

Тендерные документы и приложения

 
  • Задание (1424 KB; 25 янв 2022)
     Скачать документы

Исходный текст

Данное извещение приведено исключительно для вашего сведения.
Мы прилагаем все усилия к тому, чтобы информация на нашем сайте была всегда точной и своевременной, но мы не можем гарантировать ее полную безошибочность.
Напишите нам, если у вас есть замечания или уточнения к тексту этого извещения.